What we do · Dossier S-04

From first mobilisation to a working asset.

Execution is where feasibility is proved or contradicted. mWz acts as the single point of execution for the investor: mobilising the delivery team, procuring the supply chain, controlling cost, programme, quality and safety against one baseline, and carrying the project through commissioning into stable operation with the performance evidence to match what was promised.
Duration
Project-dependent, typically 18–48 months
Accountability
Single point of execution to the investor
Controls
Cost · programme · quality · EHS on one baseline
Reporting
Monthly control report, live variation register
Completion
Certified, documented, operating and reported

01 · PROCESS MAP

How the work moves

Input

Funded project

Approved design, executed contracts, funding in place.

Engine

Controlled delivery

Procurement, construction, quality and safety against one baseline.

Output

Operating asset

Commissioned, certified, handed over and performance-reported.

02 · WORKFLOW

Step by step, with the gates that stop it

Diamonds are stage gates. Work does not pass one until its criteria are met — which is what keeps a programme honest when it is under pressure.

01 Mobilisation

Delivery team appointed, baseline programme and cost plan fixed, site established, permits and insurances in place, control and reporting systems live from week one.

02 Procurement and award

Packages tendered to a prequalified supply chain, evaluated on capability as well as price, awarded under contracts that allocate risk to whoever can control it.

03 Construction and quality control

Progress measured against baseline, inspection and test plans enforced, non-conformances tracked to closure, safety managed as a stop-work authority rather than a report line.

Gate A — Quality and EHS clearance

Non-conformances closed and safety performance within threshold before each major milestone is certified.

04 Commissioning and testing

Systems tested individually and integrated, performance verified against the specification, operator training delivered before handover, not after.

Gate B — Completion certified

Statutory approvals obtained, documentation complete, outstanding items scheduled with dates and owners.

05 Handover and performance reporting

As-built records and O&M manuals issued, defects liability managed, and measured performance reported against what the feasibility promised.

03 · ENGAGEMENT

What we need, what you get

What we need from you

  • Approved design and executed funding — or the mandate for us to complete both.
  • Operator or end-user requirements in enough detail to commission against.
  • Approval authority for variations, with thresholds agreed in advance.
  • Handover date and any commitments already made to tenants or authorities.

What you receive

  • Single monthly control report — cost, programme, quality, safety, risk.
  • Live variation register with cost and time impact stated before approval.
  • Commissioned and certified asset with full as-built and O&M documentation.
  • Performance report comparing the operating asset with the feasibility case.

Reporting measured performance against the original feasibility closes the loop. It is how a consortium earns the right to be believed on the next project.